project management
   
 

Choose your car wash provider carefully. You are not just buying an equipment package, you are buying project management.

Project management is a dynamic process. When performed correctly, information and knowledge from your car wash provider will be exchanged in a timely manner with the contractors involved in your project. As a result, your project will flow smoothly and the finished product will look as you envisioned. However, if performed poorly, or perhaps not at all, your project will be burdened with costly mistakes and change orders.

Carwash Solutions takes great pride in each and every project. From beginning to end, your project will be managed professionally and skillfully. We will direct all contractors involved in the project to ensure they clearly understand how and when to perform their scope of work. Utilities will be located exactly where they are needed and otherwise out of sight. All equipment will be installed with skill and precision. The following pictures illustrate examples of proper and improper project management:

   
   
 
US
THEM

 

Undercarriage bar recessed with high pressure line run underfloor and penetrating floor at exact location minimizing high pressure hydraulic hose length.

BAY APPEAL: EXCELLENT
 

Undercarriage bar properly recessed but supply line to bay was never installed. Installer made up the difference with an expensive high pressure hose approximately 25 feet long.

BAY APPEAL: POOR
   
   
   
   
 
US
THEM

 

Electrical conduit to floor treadle properly installed under concrete penetrating floor at exact location. Junction box properly protected with steel cover.

BAY APPEAL: EXCELLENT



Electrical conduit to floor treadle installed using 1/2" flexible conduit above ground. Conduits and cable exposed to harsh environment.


BAY APPEAL: POOR

   
   
   
   
 
US
THEM

 


Manifold box below ground with access panel. Copper supply and return lines.
 

Floor heating supply and return manifolds properly installed.


Floor heat tubing improperly penetrating concrete floor exposed in equipment room.

   
   
   
   
 
US
THEM
   


 
 
     
All conduits and plumbing properly located out of site penetrating wash bay in exact locations. Walls are free and clear of unsightly utilities.


BAY APPEAL: EXCELLENT
 



Utilities run along bay walls.


BAY APPEAL: POOR
     
   
   
 