Time Required On-Site |
|||||
| Time Required On-Site | |||||
| Crane | |||||
![]() |
A minimum 110-ton crane (provided by GENESIS) is used to lift the building from the air-ride trailer and place it on the footings. |
||||
| 1 Day | |||||
![]() |
|
||||
![]() |
![]() |
||||
![]() |
![]() |
||||
![]() |
![]() |
||||
| Lifting of the Equipment Room | Lifting of the Wash Bay | ||||