Time Required On-Site
 
Completion of General Contractor
 
Accessories and Options
 
FAQ's
 
Video
     
     
     
  Design and Manufacturing  
     
  Customer's Responsibility  
     
 
Civil

Provide us with your civil engineering drawings and site elevations and leave the rest to us.
     
     
  2 Weeks  
     
 
Foundation

Example drawing of a foundation plan.
     
     
  3 Days  
     
 
Site Preparation

Your contractor pours our engineered footings and prepares your site while we're building your GENESIS Modular Carwash Building.
     
     
  4 weeks  
     
 
Manufacturing

The GENESIS building is built from the floor up and ships to you completely plumbed and wired.
     
 
Equipment

A Vector Rapid Wash touchless automatic is installed and tested in the GENESIS before it leaves the manufacturing facility.
     
     
  Varies by Site Location  
 
Transport

The building is located on a specially designed air-ride trailer and shipped to your site for immediate installation.
     